SINGLE POINT MOORING ANALYSIS FOR DISCONNECTION AND RE-CONNECTION OF CHAINS AND RISERS

The job consisted in assessing the load acting on riser and the mooring chains of FSO “Alba Marina” at “Rospo Mare” oil field. The FSO was removed and scrapped to be replaced with a new FSO. Supervision during operations was also provided.

Interprogetti Genova has been dealing with the design of new builds and conversions of a wide range of ships such as self-discharging bulk carriers, floating transhipment terminals, livestock carriers, tugs, oil & chemical tankers, ro-ro cargo, ro-ro pax, passenger ships, yachts, barges, offshore units, etc. Click here and discover more design and engineering​ work.